Nebraska Bids > Bid Detail

Abatement and Demolition of the Pershing Auditorium

Agency: Lincoln/Lancaster County
Level of Government: State & Local
Category:
  • P - Salvage Services
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD17470893227372012
Posted Date: Apr 14, 2023
Due Date: Apr 21, 2023
Solicitation No: 23-067

Bid Information



Type
Notice to Bidders
Status
Issued
Number
23-067 Addendum 1 (Abatement and Demolition of the Pershing Auditorium)
Issue Date & Time
3/29/2023 12:02:01 PM (CT)
Close Date & Time
4/21/2023 02:00:00 PM (CT)
Time Left 6 days 18 hours 36 minutes 28 seconds
Notes
The City of Lincoln, hereinafter referred to as Owner, is requesting bids from qualified companies for the equipment, material, and labor associated with the abatement and demolition of the Pershing Auditorium.


A pre-bid meeting will be held on the west side at the front doors at the Pershing Auditorium, 226 Centennial Mall South, Lincoln, Nebraska 68508 . This will be the only opportunity to view the inside of the building prior to bid close. Please complete Attachment L Pershing Pre-Bid Waiver and email to Teresa Fleming at tfleming@lincoln.ne.gov prior to the pre-bid. Bidders are highly encouraged to attend this pre-bid meeting.

Contact Information
Name
Teresa Fleming, Asst. Purchasing Agent
Address
440 S. 8th St.
Suite 200
Lincoln, NE 68508 USA
Phone
(402) 441-7414
Fax
Email
tfleming@lincoln.ne.gov




Bid Documents







Document name Format

Bid Invitation

Acrobat / PDF

Public Question & Answer

Acrobat / PDF


Bid Attachments





















File Name Description File Size


Data pager



Data pager

Page size:


PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50



27 items in 2 pages

23-067 General Specifications.pdf
General Specifications 166 KB

Attachment A - Sites.pdf
Site Layout 268 KB

Attachment B - Preliminary Geotech Report.pdf
Preliminary Geotech Exploration Report 1.79 MB

Attachment C - Pershing ACM Pre Demo Survey.pdf
Pershing ACM Pre Demo Survey 11.61 MB

Attachment D - Pershing ACM Abatement Provisions.pdf
Pershing ACM Abatement Provisions 179 KB

Attachment E - SanAir ACM Reports.pdf
SanAir ACM Reports 1.85 MB

Attachment F - Pershing Arch Drawings.pdf
Pershing Arch Drawings 94.56 MB

Attachment G - Pershing Remodel Drawings.pdf
Pershing Remodel Drawings 1.78 MB

Attachment H - Pershing Sound Reinforcement System Drawings.pdf
Pershing Sound Reinforcement System Drawings 13.87 MB

Attachment I - Builders Bulletin.pdf
Builders Bulletin 25.58 MB

Attachment J - Building Inspection Report.pdf
Building Inspection Report 18.43 MB

Attachment K - Building Inspection Report.pdf
Building Inspection Report 14.90 MB

Attachment L - Pershing Warning, Waiver, Release.pdf
Pershing Warning, Waiver, Release for Pre-Bid Meeting 87 KB

23-067 Insurance Requirements.pdf
Insurance Requirements 49 KB

Contract - City Const.pdf
SAMPLE DRAFT CONTRACT 257 KB



Bid Questions
















Question
Will contractor be required to bag and pay for meters or will the city handle bagging and no cost to contractor?
Answer If the Contractor deems it needs parking outside of the site footprint, costs for such parking will be the responsibility of the Contractor.
Submitted 4/12/2023 10:16:51 AM (CT)


Question
If additional asbestos material is discovered will additional time be given for completion?
Answer A blanket answer cannot be given for this question. If additional work of any kind is discovered, it will be evaluated in good faith with the Contractor to determine scope and potential impact to the project schedule, along with any appropriate changes to project cost and time.
Submitted 4/12/2023 09:53:35 AM (CT)


Question
It appears there is pipe insulation on catwalk level with asbestos, no quantities are listed for this material. How should we price this?
Answer The asbestos survey identified that there is likely piping at the catwalk level which will require abatement, but the amount could not be safely determined at the time. For purposes of the bid, do not include a cost in the lump sum for this piping. An addendum will add a unit price to be provided with the bid to abate this piping.
Submitted 4/12/2023 09:53:14 AM (CT)


Question
What is start date and where is it listed in specifications?
Answer The anticipated notice to proceed will be no later than June 1, 2023.
Submitted 4/12/2023 09:52:20 AM (CT)


Question
Who is responsible for payment for Asbestos Free Letter and Ait Tests?
If City is paying for final sign off, is there a set number of areas scheduled for visuals and air testing?
Answer All testing and documentation related to the verification of abatement completion is the responsibility of the Contractor, including the costs to perform such testing and verification, and shall be included in the Contractor's bid price.
Submitted 4/12/2023 09:52:01 AM (CT)


Question
Would Saturdays be allowed to work on Abatement?
Answer In general, yes. Contractor will be required to coordinate with downtown events, University of Nebraska home football games, etc. But in general work would be allowed on Saturdays with proper coordination.
Submitted 4/12/2023 09:51:31 AM (CT)


Question
If start date is pushed back will additional time be allowed for completion?
Answer Completion date will be equitably adjusted if the start date is delayed through no fault of the Contractor.
Submitted 4/12/2023 09:50:44 AM (CT)


Question
If the alternates are accepted how many additional calandar days will be added to the contract?
Answer Addendum 1 provides the alternate completion date should either alternate be accepted.
Submitted 4/12/2023 09:50:02 AM (CT)


Question
Can someone confirm number and locations and size of the Water Taps that need cut and capped?
Answer Domestic service is 6" which reduces to 4". There are two (2) 6" fire service lines.
Submitted 4/11/2023 12:20:38 PM (CT)


Question
Will erosion control blanketing be required on the 1:1 slopes?
Answer Yes, all 1:1 slopes will require erosion control blanketing.
Submitted 4/11/2023 11:58:46 AM (CT)

Items 1 - 10 shown of 21 • Page 1 of 2 shown

First 1 2 3 > Last



Bid Event Non-Participation Activity






Activity Date Activity Name Description
4/6/2023 02:00:00 PM (CT)
Pre-bid Meeting
A pre-bid meeting will be held on the west side at the front doors at the Pershing Auditorium, 226 Centennial Mall South, Lincoln, Nebraska 68508 . This will be the only opportunity to view the inside of the building prior to bid close. Please complete Attachment L Pershing Pre-Bid Waiver and email to Teresa Fleming at tfleming@lincoln.ne.gov prior to the pre-bid. Bidders are highly encouraged to attend this pre-bid meeting.


Event Invitations






















Supplier Name City State Contact


Data pager



Data pager

Page size:


PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50



1374 items in 92 pages
1776 Grounds Maintenance Lincoln NE Roger Berte
2020handyman Lincoln NE Antonio T Williams
360 Clean, LLC Lincoln NE Teresa Hodgen
3rd Degree Screening, Inc Council Bluffs IA
4G Steel Fabrication Lincoln NE Charlie Fleck
4X Construction Group, LLC Mansfield TX
777 Demolition LLC Lincoln NE Leon Thompson
84 Lumber Company Eighty Four PA
A 1st Rate Pumping Service, Inc Lincoln NE Melissa Mercier
A Better Earth Inc Lawrence KS
A&H CO, INC. Ironton MN
A.T.G.-Ram Industries,LLC Andover KS
A1 Iron Corp Papillion NE Tim
A-1 Pump & Jet Services Inc Emporia KS Deirdre Tollakson
A1A Sandblasting (Iowa) menahga MN michael marjama


Plan Holders







Supplier Name City State Contact Name Email Phone


Data pager



Data pager

Page size:


PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 20
  • 50



0 items in 1 pages
No records to display.

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >