Nebraska Bids > Bid Detail

Lincoln-Lancaster Human Resources Remodel

Agency: Lincoln/Lancaster County
Level of Government: State & Local
Category:
  • R - Professional, Administrative and Management Support Services
Opps ID: NBD17470189365138348
Posted Date: Dec 4, 2023
Due Date: Dec 7, 2023
Solicitation No: 23-290

Bid Information



Type
Notice to Bidders
Status
Issued
Number
23-290 Addendum 3 (Lincoln-Lancaster Human Resources Remodel)
Issue Date & Time
11/20/2023 12:00:01 PM (CT)
Close Date & Time
12/7/2023 02:00:00 PM (CT)
Time Left
2 days 18 hours 13 minutes 39 seconds
Notes
Answer one question.

Contact Information
Name
Sharon Mulder Assistant Purchasing Agent
Address
Purchasing
440 S. 8th St.
Lincoln, NE 68508 USA
Phone
(402) 441-7428
Fax
Email
smulder@lincoln.ne.gov




Bid Documents







Document name Format


Data pager



Data pager

Page size:


PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50



1 items in 1 pages

Bid Invitation

Acrobat / PDF


Bid Attachments


















File Name Description File Size


Data pager



Data pager

Page size:


PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50



12 items in 1 pages

23-290 Adv.pdf
Notice to Bidders 81 KB

Instructions to Bidders 11-2023.pdf
Instructions to Bidders 170 KB

23-290 SubmissionReceipt-InsuranceRequirements.pdf
Insurance Requirements 42 KB

contract - PBC Cons.pdf
Sample Contract 45 KB

23-290 HR Remodel General Specifications.pdf
General Specifications 120 KB

23-290 22051-05_LLHR - Contract Drawings.pdf
Drawings / Plans 10.37 MB

Empl_Class_Act_Aff_PBC.pdf
Employee Classification Act Affidavit 5 KB

Empl_Class_Act_EO.pdf
Employee Classification Act, Executive Order 83319 288 KB

Prop Info for Bids 2017.pdf
Proprietary Information for Bids/Quotes/RFP's 36 KB

23-290 Pre-Bid Meeting Attendance List.pdf
Pre-Bid Attendance List 1.30 MB

23-290 Pre-Bid Agenda.pdf
Pre-Bid Agenda 182 KB

23-290_LLHR_Addendum 2.pdf
Addendum 2 4.73 MB



Bid Questions
















Question
The Spec plans (E700, Section 260533 - Conduit, Part 2.1 – 2.6) call out GRC, IMC, EMT, and FMC conduits, but it does not call out what kind of connectors are acceptable for the EMT, Set Screw or Compression?

Answer Set screw is fine.
Submitted 12/4/2023 02:57:29 PM (CT)


Question
The to verify. The RWB-2, Tarkett Millwork Quarter Round only goes at the Breakroom Island? Should it be at all Plastic Laminate Toekicks, and at the Breakroom Booth?
Answer RWB-2 is only to be applied around Breakroom Island.
Submitted 12/4/2023 12:59:59 PM (CT)


Question
Can we get a clarification on the light reflectance for this project? Is the standard .84 LR good or do they need the .89 LR?
Answer Standard light reflectance is acceptable.
Submitted 12/4/2023 12:57:04 PM (CT)


Question
Can we get a clarification on what grid type is to be used?
Answer Please refer to Sheet A001 for specifications regarding the Acoustical Panel Ceilings and grid type.
Submitted 12/4/2023 12:55:49 PM (CT)


Question
Does Vestibule 400 get any rubber base? Nothing listed on Room Finish Schedule.
Answer Yes, RWB-1 should be applied in Vestibule 400.
Submitted 12/4/2023 12:53:34 PM (CT)


Question
1.        Can we get a clarification on what grid type is to be used?
2.        Can we get a clarification on the light reflectance requirement for this project? Is the standard .84 LR good or do they need the .89 LR?
Answer 1. Please refer to Sheet A001 for specifications regarding the Acoustical Panel Ceilings and grid type.

2. Standard light reflectance is acceptable.

Submitted 12/1/2023 01:21:45 PM (CT)


Question
1.        Rooms 361, 362, 363, 364, 365, 366. & 367. Flooring in the Room Finish Schedule, should read CPT-1 & CPT-2 to match the Finish Plans.

2.        Does the Vestibule 400 get any Rubber Base? Nothing listed on Room Finish Schedule.

3.        The to verify. The RWB-2, Tarkett Millwork Quarter Round only goes at the Breakroom Island? Should is be at all Plastic Laminate Toekicks, and at the Breakroom Booth?
Answer 1. Finish Schedule and Finish Plan were updated in Addendum 001.

2. Yes, RWB-1 should be applied in Vestibule 400.

3. RWB-2 is only to be applied around Breakroom Island.

Submitted 11/30/2023 07:28:53 AM (CT)


Question
Door #'s E340.1, E342.1, E345.1, E348.1, E360.1, E360.2, E367.1. They all have existing frames according to the door schedule but are the Wood Doors needing replaced on these openings? Please advise.
Answer No, the existing wood doors do not need to be replaced. Per General Door Schedule Note A, depending on the condition of the existing door, some may need to be sanded and stained to match the building standard stain. At Door E367.1, the existing door can be reused but will need to have glazing added to it.

Submitted 11/30/2023 07:01:02 AM (CT)


Question
Are u gonna post sign in sheet ?
Answer Sign in sheet has been attached to the Bid Attachment Section.
Submitted 11/28/2023 09:35:10 PM (CT)


Question
We found no project manual included to download and not the specifications are on drawing sheets. Please confirm these is no project manual for this project.
Answer There is no Project Manual for this project. Specifications can be found on sheets in the Contract Documents.

Submitted 11/28/2023 04:13:17 PM (CT)

Items 1 - 10 shown of 22 • Page 1 of 2 shown

First 1 2 3 > Last




TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >