MCL Construction intends to receive proposals and award contracts based DLR’s Bid Package #2 – GMP Set dated October 27
th
2022 for the following scope of work:
Scope of Work
Specification Sections
Selective Demolition 024119
Temporary Walls-Framing & Drywall 054000 & 092900
Door, Frames & Hardware 0811113 & 081416
Fire Suppression-RFP’s GMP Division 21(all)
Mechanical-RFP’s GMP Division 22 & 23
Electrical-RFP’s GMP Division 26, 27 & 28
Requirements for Major Trade RFP’s are outlined in attached 3.1 Major Trade RFP Letter for respective scope of works. MCL is finalizing BP #1 Early Equipment for AHU’s, Switchgear, Transformer & Generator. This information will be provided as soon as available for coordination and inclusion for Major Trade GMP proposals. All warranties, shipping details, shipping dates, unloading and controls information for equipment will be assigned and awarded Major trade need to be transferred to them.
The rest of the scopes of work will be released for bidding when we receive the final construction documents. In the meantime, MCL would greatly appreciate budget proposals from all other scopes not listed above.
Drawings and Proposal Documents will be available through the MCL Pipeline Suite. You will need to contact Trever Roberts by email at
tlr@mclconstruction.com
to get an invitation to this site.
Drawings and Proposal documents will be available through the MCL Pipeline Suite. For
more information about this
bid
package
or to
receive access to this site, please
contact Trever Roberts at MCL Construction;
tlr@mclconstruction.com
.
The eBid system is only serving as an advertisement of this scope of work for the University of Nebraska on behalf of MCL Construction. PLEASE DO NOT SUBMIT YOUR BID THROUGH THIS SYSTEM.