Whiting-Turner is inviting your firm to provide a proposal for the following bid packages for Architectural Hall Phase 2 based on the information outlined below. It is Whiting-Turner’s intent to select the most qualified partner who will best fit the project team. Your proposal should include a Complete package to meet the intended design as outlined below and depicted in the drawings, specifications, and all supplemental documents provided. Please clarify any assumptions that you make while preparing your proposal. Your company will be contractually tied to your bid amount barring any major scope changes. This project is tax-exempt and will require a payment and performance bond.
Whiting-Turner intends to receive proposals and award contracts based HDR’s Design Development Package –dated November 21, 2022 for the following scopes of work:
Scope of Work
Specification Sections
Steel Fabrication Division 05
Steel Erection Division 05
Roofing 07 53 25
Glass & Glazing 08 81 23 & 08 81 26
Fiberglass Sandwich Panel Assemblies & Metal Panel Systems 07 42 16 & 08 45 23
Framing, Drywall & Exterior STO system Division
Fire Suppression Division 21
The rest of the scopes of work will be released for bidding when we receive the final construction documents. In the meantime, Whiting-Turner would greatly appreciate budget proposals from all other scopes not listed above. (Demolition, Excavation, Concrete, Mass Timber, Mechanical & Electrical were in separate bid packages)
Drawings and Proposal Documents will be available through the Whiting-Turner Building Connected Site. You will need to contact Matt Schulte by email at
matt.schulte@whiting-turner.com
to get an invitation to this site.
The eBid system is only serving as an advertisement of this scope of work for the University of Nebraska on behalf of Whiting-Turner Contracting Co. PLEASE DO NOT SUBMIT YOUR BID THROUGH THIS SYSTEM.