Nebraska Bids > Bid Detail

Whiting-Turner Contracting Co.; UNL Architecture Hall Phase 2-Envelope Package-Solicitation of Subcontractor Bids

Agency: University of Nebraska-Lincoln
Level of Government: State & Local
Category:
  • 71 - Furniture
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD12289772192778424
Posted Date: Nov 30, 2022
Due Date: Dec 7, 2022
Solicitation No: 3736-22-7200
Source: https://unlebid.ionwave.net/Pu...
Bid Information
Type RFP - Request for Proposal
Status Issued
Number 3736-22-7200 (Whiting-Turner Contracting Co.; UNL Architecture Hall Phase 2-Envelope Package-Solicitation of Subcontractor Bids)
Issue Date & Time 11/30/2022 12:01:01 PM (CT)
Close Date & Time 12/7/2022 12:00:00 PM (CT)
Notes
The Whiting-Turner Contracting Co. has been selected as Construction Manager for Phase 2 of Architecture Hall Renovation and Addition.
Whiting-Turner is inviting your firm to provide a proposal for the following bid packages for Architectural Hall Phase 2 based on the information outlined below. It is Whiting-Turner’s intent to select the most qualified partner who will best fit the project team. Your proposal should include a Complete package to meet the intended design as outlined below and depicted in the drawings, specifications, and all supplemental documents provided. Please clarify any assumptions that you make while preparing your proposal. Your company will be contractually tied to your bid amount barring any major scope changes. This project is tax-exempt and will require a payment and performance bond.

Whiting-Turner intends to receive proposals and award contracts based HDR’s Design Development Package –dated November 21, 2022 for the following scopes of work:

Scope of Work Specification Sections

Steel Fabrication Division 05

Steel Erection Division 05

Roofing 07 53 25

Glass & Glazing 08 81 23 & 08 81 26

Fiberglass Sandwich Panel Assemblies & Metal Panel Systems 07 42 16 & 08 45 23

Framing, Drywall & Exterior STO system Division

Fire Suppression Division 21

The rest of the scopes of work will be released for bidding when we receive the final construction documents. In the meantime, Whiting-Turner would greatly appreciate budget proposals from all other scopes not listed above. (Demolition, Excavation, Concrete, Mass Timber, Mechanical & Electrical were in separate bid packages)

Drawings and Proposal Documents will be available through the Whiting-Turner Building Connected Site. You will need to contact Matt Schulte by email at matt.schulte@whiting-turner.com to get an invitation to this site.

The eBid system is only serving as an advertisement of this scope of work for the University of Nebraska on behalf of Whiting-Turner Contracting Co. PLEASE DO NOT SUBMIT YOUR BID THROUGH THIS SYSTEM.

Contact Information
Name The Whiting Turner Contracting Company
Address 1015 N. 98th Street,
Suite 101
Omaha, NE 68114 USA
Phone 1 (949) 678-4282
Fax
Email matt.schulte@whiting-turner.com

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >