Boiler Vessel Integrity Inspection
Agency: | |
---|---|
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159236911878695 |
Posted Date: | Feb 29, 2024 |
Due Date: | Mar 14, 2024 |
Source: | https://sam.gov/opp/bd08d2d94c... |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
- All Dates/Times are: (UTC-06:00) CENTRAL STANDARD TIME, CHICAGO, USA
- Updated Published Date: Feb 29, 2024 10:43 am CST
- Original Published Date: Feb 27, 2024 11:40 am CST
- Updated Date Offers Due: Mar 14, 2024 11:00 am CDT
- Original Date Offers Due: Mar 14, 2024 11:00 am CDT
- Inactive Policy: 15 days after date offers due
- Updated Inactive Date: Mar 29, 2024
- Original Inactive Date: Mar 29, 2024
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: H344 - INSPECTION- FURNACE, STEAM PLANT, AND DRYING EQUIPMENT; NUCLEAR REACTORS
-
NAICS Code:
- 238220 - Plumbing, Heating, and Air-Conditioning Contractors
-
Place of Performance:
Offutt AFB , NE 68113USA
The scope of work is to remove the jacketing and insulation from around Boiler 3, clean the vessel surface, and perform NDT/NDE to verify and certify the structural integrity of the boiler vessel. Afterwards, if the structural integrity is satisfactory; the insulation and jacketing is to be replaced and the boiler put back in service with a full combustion check and tuning as well as operational and safety inspections. The Contractor shall provide a proposal for the work split into two portions in accordance with this conditional scenario. See Performance Work Statement (PWS) for additional information.
Technical questions are due by 6 March 2024 by 11:00 AM CST.
Answers to questions will be available by 8 March 2024 at 11:00 AM CST.
Quotations are due by 14 March 2024 at 11:00 AM CST.
***AMENDMENT 0002***
This amendment is to incorporate additional requirements in the Performance Work Statement (PWS). Please see the PWS for additional information. Amendment date 29 February 2024.
***AMENDMENT 0001***
A site visit is being incorporated. The site visit is scheduled for 05 March 2024 at 1:00 PM CST on the East side of Bldg 304. Refer to Page 1 of "FA460024Q0009 Combo Solicitation". For contractors requiring access to Offutt AFB, please fill out the "NCIC Screening and Pass Request" and e-mail to SSgt Patrick Pinault at patrick.pinault@us.af.mil and SrA Justin Smith at justin.smith.216@us.af.mil.
- ADMIN ONLY NO REQTN CP 402 232 6459 106 PEACEKEEPER DR BLDG 3 STE 2N3
- OFFUTT AFB , NE 68113
- USA
- Patrick Pinault
- patrick.pinault@us.af.mil
- Phone Number 4022946393
- Justin Smith
- justin.smith.216@us.af.mil
- Phone Number 4022325690
- Feb 29, 2024 10:43 am CSTCombined Synopsis/Solicitation (Updated)
- Feb 29, 2024 10:09 am CST Combined Synopsis/Solicitation (Updated)
- Feb 28, 2024 08:14 am CST Combined Synopsis/Solicitation (Updated)
- Feb 27, 2024 04:33 pm CST Combined Synopsis/Solicitation (Updated)
- Feb 27, 2024 11:40 am CST Combined Synopsis/Solicitation (Original)
- Feb 22, 2024 02:20 pm CST Sources Sought (Original)
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.